Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Case studies // Montevetro

Location:Montevetro Building, Barrow Street, Dublin. 2
Building Size:8th and 9th Floor
Architect:MOLA Architecture
Project Manager(s):John Sisk & Sons
No. of Occupants:

Supply and installation of partitions and acoustic solutions for offices.


W2W were awarded the supply and installation of partitions to the 8th and 9th floor at Montevetro Building, Barrow Street, Dublin. 2 W2W installed Optima partitioning system, drywall, bulkheads, doors and installation of acoustic ceiling islands throughout the two floors for sound absorption.
 


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Case studies // Spencer Stuart

Location:Whittaker Court, Dublin 2
Building Size:
Architect:Gensler
Project Manager(s):Structuretone
No. of Occupants:48

Supply and installation of office furniture

Spencer Stuart  openned a new Global Technology and Knowledge Centre in Whitaker Court, Dublin. 2

W2W were awarded the supply and installation of office furniture to the 2nd floor at Whitaker Court.   W2W installed 45 no Knoll ‘’Scope’’ workstations and executive desking, Liberty task chairs and KI storage units.  W2W installed meeting tables by Wilkhahn, meeting chairs by Vitra and canteen furniture by Arper.   


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Case studies // Warner Chilcott

Location:Grand Canal Square, Dublin. 2
Building Size:
Architect:NMA
Project Manager(s):Structuretone
No. of Occupants:

Installation of glazed Optima partitioning systems

Warner Chilcott have opened new Office on Grand Canal Square in Dublin.

W2W installed glazed Optima partitioning systems with timber doors to one floor. 


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Case studies // Walkers Global

Location:The Anchorage, 17/19 Sir John Rogerson's Quay, Dublin 2
Building Size:9,024 sq ft
Architect:HJL
Project Manager(s):Structuretone
No. of Occupants:18

Supply and installation of glazed partition system

Walkers Global opened Dublin office in September 2010 to provide an integrated Irish legal and corporate administration service to our international client base.
 

W2W were awarded the supply and installation of glazed partition system to two floors at The Anchorage.

W2W installed glazed partitioning System to two floors with manifestation. W2W installed timber doors, internal glazed doors and folding wall. 
 


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Case studies // Deloitte

Location:1 Hatch Street
Building Size:4,880 sqm
Architect:Keogan Architects
Project Manager(s):
No. of Occupants:190

Office Fit out

Office Fit out to six storey new build on Hatch Street.

John Gray, Head of IT & Operations, Deliotte

“I am very much of the view that a strong team will deliver above and beyond the sum of the individual parts, and I think this has certainly been our experience to date with W2W.”

W2W installed single glazed Polar, double glazed Polar partitioning systems, folding walls, ceilings and dry lining, Mechanical & Electrical installation, kitchen installation and floor finishes and installed 190 Plateau workstations with Knoll Life task chairs and Orangebox visitor chairs throughout building.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Cryptologic

Location:Marine House, Clanwilliam Place, Dublin.2
Building Size:1,524 sqm
Architect:W2W
Project Manager(s):CBRE
No. of Occupants:17

Supply and installation of office fit out

Crytologic relocated its Headquarters from Canada to an office building in Marine House, Clanwilliam Place, Dublin.2.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Clanwilliam Place.

W2W installed Ls90 partitioning System to one floors with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, 17 Knoll ‘’Scope’’ workstations, Knoll “Autostrada” executive desking, Life task chairs and Florence Knoll sofas for reception areas.


Case studies // Cryptologic

Location:Marine House, Clanwilliam Place, Dublin.2
Building Size:1,524 sqm
Architect:W2W
Project Manager(s):CBRE
No. of Occupants:17

Supply and installation of office fit out

Crytologic relocated its Headquarters from Canada to an office building in Marine House, Clanwilliam Place, Dublin.2.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Clanwilliam Place.

W2W installed Ls90 partitioning System to one floors with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, 17 Knoll ‘’Scope’’ workstations, Knoll “Autostrada” executive desking, Life task chairs and Florence Knoll sofas for reception areas.


Case studies // Cryptologic

Location:Marine House, Clanwilliam Place, Dublin.2
Building Size:1,524 sqm
Architect:W2W
Project Manager(s):CBRE
No. of Occupants:17

Supply and installation of office fit out

Crytologic relocated its Headquarters from Canada to an office building in Marine House, Clanwilliam Place, Dublin.2.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Clanwilliam Place.

W2W installed Ls90 partitioning System to one floors with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, 17 Knoll ‘’Scope’’ workstations, Knoll “Autostrada” executive desking, Life task chairs and Florence Knoll sofas for reception areas.


Case studies // Cryptologic

Location:Marine House, Clanwilliam Place, Dublin.2
Building Size:1,524 sqm
Architect:W2W
Project Manager(s):CBRE
No. of Occupants:17

Supply and installation of office fit out

Crytologic relocated its Headquarters from Canada to an office building in Marine House, Clanwilliam Place, Dublin.2.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Clanwilliam Place.

W2W installed Ls90 partitioning System to one floors with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, 17 Knoll ‘’Scope’’ workstations, Knoll “Autostrada” executive desking, Life task chairs and Florence Knoll sofas for reception areas.


Case studies // Cryptologic

Location:Marine House, Clanwilliam Place, Dublin.2
Building Size:1,524 sqm
Architect:W2W
Project Manager(s):CBRE
No. of Occupants:17

Supply and installation of office fit out

Crytologic relocated its Headquarters from Canada to an office building in Marine House, Clanwilliam Place, Dublin.2.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Clanwilliam Place.

W2W installed Ls90 partitioning System to one floors with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, 17 Knoll ‘’Scope’’ workstations, Knoll “Autostrada” executive desking, Life task chairs and Florence Knoll sofas for reception areas.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Aviareto

Location:Suit 3, Plaza 252, Blanchardstown Corporate Park, Dublin.15
Building Size:3,000 sqm
Architect:S&P Architects
Project Manager(s):
No. of Occupants:

Supply and installation of office fit out

Aviareto relocated its Irish Headquarters to a new office building in Blanchardstown Corporate Park.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Plaza 252 Building.

W2W installed Single Glazed partitioning System to one floor with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, Glider Executive desking, Arche boardroom table, Leather executive chairs, breakout furniture and reception furniture.


Case studies // Aviareto

Location:Suit 3, Plaza 252, Blanchardstown Corporate Park, Dublin.15
Building Size:3,000 sqm
Architect:S&P Architects
Project Manager(s):
No. of Occupants:

Supply and installation of office fit out

Aviareto relocated its Irish Headquarters to a new office building in Blanchardstown Corporate Park.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Plaza 252 Building.

W2W installed Single Glazed partitioning System to one floor with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, Glider Executive desking, Arche boardroom table, Leather executive chairs, breakout furniture and reception furniture.


Case studies // Aviareto

Location:Suit 3, Plaza 252, Blanchardstown Corporate Park, Dublin.15
Building Size:3,000 sqm
Architect:S&P Architects
Project Manager(s):
No. of Occupants:

Supply and installation of office fit out

Aviareto relocated its Irish Headquarters to a new office building in Blanchardstown Corporate Park.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Plaza 252 Building.

W2W installed Single Glazed partitioning System to one floor with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, Glider Executive desking, Arche boardroom table, Leather executive chairs, breakout furniture and reception furniture.


Case studies // Aviareto

Location:Suit 3, Plaza 252, Blanchardstown Corporate Park, Dublin.15
Building Size:3,000 sqm
Architect:S&P Architects
Project Manager(s):
No. of Occupants:

Supply and installation of office fit out

Aviareto relocated its Irish Headquarters to a new office building in Blanchardstown Corporate Park.

W2W were awarded the supply and installation of office fit out to the 2nd floor at Plaza 252 Building.

W2W installed Single Glazed partitioning System to one floor with manifestation. W2W installed suspended ceilings, floor finishes, internal doors and co-ordination of M&E installation, Glider Executive desking, Arche boardroom table, Leather executive chairs, breakout furniture and reception furniture.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Icon plc

Location:South County Business Park
Building Size:11,205 sqm
Architect:RKD
Project Manager(s):
No. of Occupants:570

Supply and installation of partitions, furniture and acoustic system for Icon PLC

Office fit out to 11,205sqm campus of 3rd generation accommodation for pharmaceutical clinical research.

W2W were awarded the supply and installation of partitions, furniture and acoustic system to Blocks A, B, C & D at South County Business Park, Sandyford, Dublin. 18.

W2W installed Knoll Scope technical spine desking to all four floors in Block A, B, C and D with KSS storage, Liberty task chairs, X10 cantilever meeting chairs and Orangebox breakout furniture. W2W installed double glazed partitioning system, drywall and acoustic system to all four floors in Block A, B, C and D.


Case studies // Icon plc

Location:South County Business Park
Building Size:11,205 sqm
Architect:RKD
Project Manager(s):
No. of Occupants:570

Supply and installation of partitions, furniture and acoustic system for Icon PLC

Office fit out to 11,205sqm campus of 3rd generation accommodation for pharmaceutical clinical research.

W2W were awarded the supply and installation of partitions, furniture and acoustic system to Blocks A, B, C & D at South County Business Park, Sandyford, Dublin. 18.

W2W installed Knoll Scope technical spine desking to all four floors in Block A, B, C and D with KSS storage, Liberty task chairs, X10 cantilever meeting chairs and Orangebox breakout furniture. W2W installed double glazed partitioning system, drywall and acoustic system to all four floors in Block A, B, C and D.


Case studies // Icon plc

Location:South County Business Park
Building Size:11,205 sqm
Architect:RKD
Project Manager(s):
No. of Occupants:570

Supply and installation of partitions, furniture and acoustic system for Icon PLC

Office fit out to 11,205sqm campus of 3rd generation accommodation for pharmaceutical clinical research.

W2W were awarded the supply and installation of partitions, furniture and acoustic system to Blocks A, B, C & D at South County Business Park, Sandyford, Dublin. 18.

W2W installed Knoll Scope technical spine desking to all four floors in Block A, B, C and D with KSS storage, Liberty task chairs, X10 cantilever meeting chairs and Orangebox breakout furniture. W2W installed double glazed partitioning system, drywall and acoustic system to all four floors in Block A, B, C and D.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // Eirgrid

Location:The Oval, Shelbourne Road, Dublin 4
Building Size:5814 sqm
Architect:Henry J Lyons
Project Manager(s):G&T Crampton
No. of Occupants:

Installation of double glazed Polar and single glazed Polar partitioning systems for Eigrid

Eirgrid relocated its Headquarters to five floors in the building named The Oval, at Shelbourne Road, Dublin 4.

W2W installed double glazed Polar and single glazed Polar partitioning systems with curved glazed to five floors with full height timber doors.


Case studies // Eirgrid

Location:The Oval, Shelbourne Road, Dublin 4
Building Size:5814 sqm
Architect:Henry J Lyons
Project Manager(s):G&T Crampton
No. of Occupants:

Installation of double glazed Polar and single glazed Polar partitioning systems for Eigrid

Eirgrid relocated its Headquarters to five floors in the building named The Oval, at Shelbourne Road, Dublin 4.

W2W installed double glazed Polar and single glazed Polar partitioning systems with curved glazed to five floors with full height timber doors.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4

Case studies // CBRE

Location:Connaught House, Burlington Road, Dublin.4
Building Size:1,550 sqm
Architect:HKR
Project Manager(s):
No. of Occupants:155

Supply and installation of partitions and furniture for CBRE

Installation of partitions and furniture in the headquarter of CBRE in Connaught House at Burlington Road, Dublin. 4.

W2W were awarded the supply and installation of partitions and furniture.

W2W installed 155 workstations of Bralco glider to open plan areas. W2W installed Liberty task seating, a bespoke boardroom table and bespoke reception desk, Executive desks and meeting tables, with Orangebox canteen and breakout furniture, Howe 40/4 chairs with single glazed polar partitions throughout.


Supply and installation of partitions and furniture for CBRE 2
Supply and installation of partitions and furniture for CBRE 3
Supply and installation of partitions and furniture for CBRE 4
Walls to Workstations